PROJECT BACKGROUND

NEPEAN Engineering was on a tight deadline. They were relocating their Sydney facility from Narellan to Prestons and needed to maintain workflow continuity — without compromise. With rising project demand, they also had to improve spray painting efficiency in a smaller space while staying compliant with safety and ventilation standards.

SOLUTION

BlastOne designed and delivered a dedicated spray painting ventilation system, custom-fit to the new site layout. The system included 3 MASTERFLO dual-fan filter walls, engineered to maximize airflow, control overspray, and improve operator conditions — all within the constraints of the new footprint.

RESULTS

NEPEAN Engineering completed their relocation on schedule and without disruption to operations. The new ventilation setup not only met compliance needs but also boosted production capacity — giving their team the confidence to take on more work!

COMMENTS

““Your efforts played a vital role in getting us through this major transition, and we truly appreciate the dedication, flexibility, and professionalism shown by your team to make things happen – often under tight timelines.”

Arun Bangalore, Nepean Engineering

CASE STUDIES

large-mining-company-case-study-pic7-400x400

LARGE MINING COMPANY’S HIGH-EFFICIENCY BLAST ROOM

General Dynamics Case Study

GENERAL DYNAMICS INCREASES BLASTING PRODUCTIVITY BY 4X

Animated-Pressure-Wash2

CASE STUDIES HOME

Contact BlastOne

We love to talk to customers and help them make the best decisions when purchasing equipment.
You can reach us via our Live Chat, Email, Phone, and Online Form.

Add to quote:

Registration is required to create a Quote.

Click Here to Login or Register.

Add to existing quote:

Add to Quote

Add to a new quote:

Send the request

BlastOne says
Thank you for submitting your quote. A sales representative will follow up with you asap.
Share Quote via Email

Share