PROJECT BACKGROUND
NEPEAN Engineering was on a tight deadline. They were relocating their Sydney facility from Narellan to Prestons and needed to maintain workflow continuity — without compromise. With rising project demand, they also had to improve spray painting efficiency in a smaller space while staying compliant with safety and ventilation standards.
SOLUTION
BlastOne designed and delivered a dedicated spray painting ventilation system, custom-fit to the new site layout. The system included 3 MASTERFLO dual-fan filter walls, engineered to maximize airflow, control overspray, and improve operator conditions — all within the constraints of the new footprint.
RESULTS
NEPEAN Engineering completed their relocation on schedule and without disruption to operations. The new ventilation setup not only met compliance needs but also boosted production capacity — giving their team the confidence to take on more work!




COMMENTS
““Your efforts played a vital role in getting us through this major transition, and we truly appreciate the dedication, flexibility, and professionalism shown by your team to make things happen – often under tight timelines.”
Arun Bangalore, Nepean Engineering
CASE STUDIES
Contact BlastOne
We love to talk to customers and help them make the best decisions when purchasing equipment.
You can reach us via our Live Chat, Email, Phone, and Online Form.





